Discussion 2- Proj Risk

 Chapter 4: Project Risk Management SystemsChapter 5: Project Risk Contexts and DriversChapter 6: Approach to Project Risk IdentificationInitial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.Also, provide a graduate-level response to each of the following questions:

  1. What factors make a project high risk?
  2. What are the three types of project risk?
  3. How do you write a good project risk?
[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!] [Your initial post should be at least 450+ words and in APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review] 

 

Text-

Title: Managing Project Risks; 464 Pages

ISBN: 978-1-119-48975-7

Authors: Peter J. Edwards, Paulo Vaz Serra, Michael Edwards

Publisher: Wiley-Blackwell

Publication Date: 2019

Tags: No tags