Discussion 8- Exe Proj

Assigned Readings:Chapter 8. Cost Estimation and Budgeting Initial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.Also, provide a graduate-level response to each of the following questions:

  1. Imagine you are developing a software package for your company’s intranet. Give examples of the various types of costs (labor, materials, equipment and facilities, subcontractors, etc.) and how they would apply to your project.
  2. Think of an example of parametric estimating in your personal experience, such as the use of a cost multiplier based on a similar, past cost.  Did parametric estimating work or not?  Discuss the reasons why.
[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!]  [Your initial post should be at least 450+ words and in APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review]

Text-

Title: Project Management 

ISBN: 9780134730332 

Authors: Pinto 

Publisher: Pearson 

Edition: 5TH 19

Tags: No tags