Discussion 3- Planning Project

Assigned Readings:Chapter 7: Project InitiationChapter 8: Overview of Project PlanningInitial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.Also, provide a graduate-level response to each of the following questions:

  1.  Your manager recently gave you the responsibility of selecting the next project, which you will manage as the project manager.  There are currently 3 projects on hold to choose from.  Using the weighted scoring models method, you determine that Project A has a weighted score of 16, Project B has a weighted score of 14, and Project C has a weighted score of 17.  Which project do you choose and why?
[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!]  [Your initial post should be at least 450+ words and in APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review]

Text –

Title: Project Management 

Subtitle: https://opentextbc.ca/projectmanagement/ 

ISBN: 978-1-77420-013-1 

Authors: Adrienne Watt 

Publisher: BCcampus 

Publication Date: August 14, 2014 

Edition: 2nd Edition

Tags: No tags