Project management

 Unlimited Attempts AllowedAvailable after Nov 3, 2022 12:00amAvailable after Nov 3, 2022 12:00amDetails

Due: 12/01/2022

Chapter: 1-12

Worth: 15 points

Assignment: Complete both a set of business management plans and a Microsoft Project for a  project

Scenario:

  • Base the assignment on a fictional business that has its own in-house development staff
  • The project should be sufficiently large/complex so that it will take between 9-12 months to complete
  • Your choice on the numbers/types of employees… but I’m expecting around a dozen or so
  • Use the traditional SDLC model for development… so most likely 6 top-level summary tasks
  • The vast majority of the costs should be labor, but should contain some non-labor costs

Requirements: There are two parts:

Part 1 – Create a single Word document to cover the following:

  • Do NOT use the same scenario as Assignment 6 (This would confuse the plagiarism checker)
  • The Project Charter
  • A Cost Management Plan
  • A Quality Management Plan
  • A Human Resources Management Plan
  • A Communications Management Plan
  • A Risk Management Plan
  • Paraphrase, do not copy! No more than 35% of the content can be copied

Note: I’m expecting this part of the assignment to be about 10-15 single-spaced pages total

Part 2 – The Microsoft Project document

  • Multiple levels of Work Breakdown Structures
  • Resource table by employee name and some material
  • Full cost per WBS
  • Full work schedule per WBS (without over-allocating employees)
  • Create a Tracking Gantt with some schedule slippage and task completion
  • Create a Earned Value Management report with a report date about 1/2 way through the project

Expectations: A two files that contains the two parts (a DOCX file and a MPP file) Yes, I want you to submit 2 files for this assignment

Instructions: Submit your files using the naming convention in the syllabus, for example: 